Major Performance

2024

  • SK Hynix_Yongin Cluster Integrated Environmental Permit Technical Advisory Service
  • Technical service for preparing the integrated environment management plan of the SAMPYO cement and acquiring the integrated permission
  • Report on the 4th amendment to the 24th Yongseong Complex 1 Integration Act
  • Preparation of the method for evaluating optimal application techniques and the linkage of ESG environmental evaluation at integrated management sites
  • Business related to the change management agency for the integrated permission of Hwaseong workplace
  • 24 Year Yongseong Complex 2 Reasons to Change the Integration Act

2023

  • SKE Integrated Environmental License Service
  • Technical advisory service for SK Hynix's Icheon Campus Integration Act (change)
  • SKGC Integrated Environmental Permit Change Reporting Service Due to STAC Wastewater Inflow
  • 2nd amendment to the LG Chemical (Soluble) Integration Act was reported
  • SK Hynix Cheongju 2 Campus Integration Act License Change Consultation
  • Acting as an Integrated Permit for Samsung Electronics' Giheung Plant
  • Report on the 3rd change to the LG Chem (Yongsung) Integration Act

2022

  • Building an integrated environmental management system for SKI in 22 years
  • SKGC Investment Business Integrated
  • Environmental License Change Permission Service
    Agency for Integrated Environmental Permit of Samsung Electronics Co., Ltd._Service by Agency for License of the Transaction Act (Hwaseong Plant)
  • Cheongju M15 Extension (Ph2/Ph3) Integration Act License (New) Technical Advisory Service
  • Building an integrated environmental management system for SKI in 22 years_phase1
  • A Policy Study on the Improvement of Permitted Discharge Standards for Semiconductor Wastewater
  • A Policy Study on the Improvement of Permitted Discharge Standards for Semiconductor Wastewater
  • License related to the integration law of LG Chem's VCM12 plant, and license for the integration law following the additional installation of SM RTO
  • Nexlene 2nd Value-up Construction Integrated Environmental Permit_SK Geocentric
  • LG Chem IPA Extension Integrated Environmental Permit Service

2021

  • Technical Advisory Service for SK Hynix Icheon/Cheongju Campus Integration Act (Change/New)
  • Preparation of the Semiconductor Association's integrated environmental management system for the semiconductor industry
  • LG Chem VCM Solid State Construction Process Pilot Facility Integration Act License

2020

  • Technical service for obtaining approval for preparation of SK Energy Integrated Environmental Management Plan
  • Technical service for obtaining approval for preparation of SK Lubrients Integrated Environmental Management Plan
  • Technical service for preparing the SK Siltron Integrated Environment Management Plan and acquiring the Integrated Permit (Cheongju Plant)

2019

  • SKGC, technical services for responding to individual law(develop integrated environmental management plan/acquire licensing)
  • KNC(Korea Nexlene Company), services to develop integrated environmental management plan
  • UAC(Ulsan Aromatics Corporation), services to develop integrated environmental management plan
  • Taekwang Industrial Co. Ltd., preliminary feasibility study on fuel cell generation project
  • Construction for Dongtan – Induckwon double track railways Zone 9 (T/K)
  • Working design & change design for Incheon fuel cell generation project
  • SK Incheon Petrochem, develop integrated environmental management plan for CSU process of integrated licensing pilot project
  • LG Chem, services including planning for integrated environmental management
  • Working design for the tunnel sector(Gwangmyeong – Siheung city hall) in the private investment project of Sinansan Line double track railways
  • Underground safety evaluation for the private investment project of Sinansan Line double track railways

2018

  • SK hynix, consulting on the establishment of a preemptive strategy for integrated management system
  • LG Chem Yeosu plant(Yongseong, Hwachi), consulting for development of integrated environmental management plan
  • New Green, services to develop integrated environmental management plan and technical services to acquire integrated licensing
  • SK hynix, technical consulting for early acquisition of integrated licensing to implement the special countermeasures
  • Korea Environment Development, services to develop integrated environmental management plan and technical services to acquire integrated licensing
  • VINOTEC, services to develop integrated environmental management plan and technical services to acquire integrated licensing
  • EMK Seungkyung, services to develop integrated environmental management plan and technical services to acquire integrated licensing
  • DANA Energy Solution, services to develop integrated environmental management plan and technical services to acquire integrated licensing
  • Working design of local water supply system modernization project, 2017(Boeun-gun)
  • Shin Daehan Oil Refining, services to develop integrated environmental management plan and technical services to acquire integrated licensing
  • EIG, services to calculate fuel cell operation expenses and develop report
  • Working design of local water supply system modernization project, (Changnyeong-gun)
  • Design proposal for the private investment project on improvement of sewage treatment plant (Yeongdong-gun)
  • Study on the actual condition of degraded public sewage treatment plant and feasibility study on improvement plan (Ministry of Environment)
  • Gwanggyo garage, sunlight generation project
  • Technical review and cost estimation for installation project of waste incineration facility, Gimhae
  • The third party design for the private investment project on modernization of Cheonan sewage treatment plant (basic design)
  • Cost estimation and technical review for preliminary feasibility study of public institute on Daeho Lake water sunlight generation project
  • Estimation of demand and cost for private investment project on extension of resource recovery facility, Gyeongsan
  • Expressway Corporation, basic design for sunlight generation project utilizing resources, 2018

2017

  • Seonam Sewage Treatment Center, licensing for local heating supply by using sewage heat
  • Licensing for Incheon fuel cell generation project (power generation business and construction planning licensing, construction licensing, etc.)
  • Inspect the operation status of integrated environmental management system and study on the improvement plan (Ministry of Environment)
  • Initial design proposal for private investment project on the maintenance of wastewater pipes in the national industrial complex (Eastern, western zone)
  • Study on the estimation of the rational goal for providing water supply system in rural areas and effective management of small-scale water supply facilities
  • Study on the benefit estimation for degraded sewage treatment plant (Ministry of Environment)
  • VFM for private investment project on the extension of Gyeongsan public sewage treatment plant
  • Technical proposal for modernization basic design for local water supply system (Changnyeong-gun)
  • Technical review and cost estimation for preliminary feasibility study of public institute on developing Haenam new renewable energy complex
  • Feasibility study design to proceed fuel cell generation project
  • Working design for Incheon fuel cell generation project
  • Gwangju EIG fuel cell generation project Tech DD
  • Working design for private investment project on Pocheon – Hwado highway Zone 3
  • Private investment project on Sinansan Line double track railways

2016

  • Initial design proposal for private investment project on modernizing Cheonan sewage treatment plant
  • Study on business process manual(draft) for the degraded water supply system maintenance project (Ministry of Environment)
  • Initial design proposal for private investment project on modernizing Daejeon sewage treatment plant
  • Study on the implement plan for private investment project of improving degraded water supply system facility (Korea Private Investment Society)
  • Study on VFM for private investment project of sludge treatment facility, Mungyeong
  • Basic design of local water supply system modernization project (Hongcheon-gun, Buan-gun)
  • PSC estimation and alternative plan for private investment project on Clean Energy Center, Siheung
  • Technical review and cost estimation for preliminary feasibility study of public project on developing fuel cell 4-step generation facility, Bundang headquarter.
  • Technical review and cost estimation for feasibility study on developing Taeback Gadeoksan Yooksang Wind Plant
  • Technical review and cost estimation for private investment project on incineration of daily wastes, Taean-gun
  • Seonam Sewage Treatment Center, services to develop proposal for fuel cell generation project
  • Collection and analysis of influence factors of Shield TBM site drilling data
  • Technical review for the feasibility study on Sinbundangsun Line new station

2015

  • Initial design proposal for private investment project on modernizing Daejeon advanced water treatment facility
  • Supply local heating by using sewage heat from Seonam Sewage Treatment Center
  • Working design for private investment project of Jingeon Pureun Water Center, Namyangju
  • Working design for construction of JinJeob Line(Danggogae – Jinjeob) double track railways Zone 4
  • Change design of tunnel excavation method in the middle of building roads for Gimpo urban railways Zone 5.
  • Construction for Samsung – Dongtan Great Train Express Zone 2 (turnkey)
  • Initial proposal for Suwon tram private investment project
  • Working design for private investment project on Seonam Sewage Treatment Center
  • Initial design proposal for private investment project on modernizing facilities, Daejeon

2014

  • Initial design proposal for private investment project on Danwol purification plant, Chungju
  • Basic design for BTL on the maintenance of sewage pipes, Pohang
  • Basic design for BTL, Pohang
  • Construction for JinJeob Line(Danggogae – Jinjeob) double track railways Zone 4
  • Initial design proposal for private investment project on Chungju – Danwol purification plant
  • Construction for JinJeob Line(Danggogae – Jinjeob) double track railways Zone 4

2013

  • Three projects including the study on cost estimation method of environmental energy sector in Seoul
  • Private investment project on Unsan purification plant, Pocheon
  • VFM study on private investment project for expending sewerage system, Ansung
  • VFM study on BTL of replacing decrepit pipes and improving them, Yeongam-gun
  • Private investment project on integrated supply of customized industrial waterworks in Mipo National Industrial Complex, Ulsan
  • VFM study on private investment project for Namgu integrated purification plant, Pohang
  • Initial design proposal for private investment project on modernizing Seongnam Water Quality Recovery Center
  • Study on cost estimation method for environment energy field, Seoul
  • Pocheon Combined Cycle Power Plant, services to develop the plan for new renewable energy project
  • Working design for Anyang Bakdal PJT
  • Working design for road construction of Joongang Line Dodam – Yeongcheon double track railways Zone 11
  • Road construction for Gimpo urban railways Zone 1 (turnkey)

2012

  • Basic design for the underground project of Bakdal sewage treatment plant, Anyang
  • Basic design for Anyang Bakdal PJT (turnkey)
  • Construction of Hwaseong Dongtan(2) Water Quality Recovery Center (turnkey)
  • Planning report for Pohang development project (geothermal power generation)
  • Initial design proposal for Seoul South Express (Oryu – Jamsil) double track railways
  • Planning service to develop GEO City, Pohang
  • Road construction for Joongang Line Dodam – Yeongcheon double track railways Zone 11 (turnkey)

2011

  • Working design for BTL on the maintenance of sewage pipes, Youngju
  • Basic design for private investment project on integrated sewerage system facility, Gapyeong-gun
  • 3-stages private investment project on wide area water supply near Daecheong Dam
  • VFM study on sewerage system facility, Yeoju-gun
  • Preliminary feasibility study for water supply facilities in Godeok Industrial Complex
  • Basic design for the modernization of environmental basic facilities and the park development, Hanam (turnkey)
  • Basic design for BOT private investment project, Seonam Sewage Treatment Center
  • Working design for Sinbundangsun Line (Yongsan – Gangnam) double track railways
  • Initial design proposal for private investment project on Seonam Sewage Treatment Center
  • VFM study on private investment project for Nangok Line light rail
  • Study on wind load simulation for functional changeable direction sign and structure optimization
  • Study on lining structure for improving airtightness of tube structure
  • Technical development of segment tunnel lining by using cable assembling system

2010

  • Proposal design for BTL on the maintenance of sewage pipes, Youngju
  • Optimum water pipe network system (Yeongwol-gun, Jeongseon-gun) developing business (turnkey)
  • Basic design for Saemangeum CSOs and precipitation treatment project (turnkey)
  • Construction for customized industrial waterworks in Daesan Coastal Industrial Region (turnkey)
  • Study on the method to utilize the waste heat from LFG generation and CDM project generation, Vietnam
  • Construction project for wood wastes fuel material plant, Cambodia
  • Initial design proposal for private investment project on clean water supply in Gyeongsangbuk-do and Daegu
  • Working design for construction of civil engineering structures of transit center, Gyeonggi-do provincial government office station